SAE ARP6028 PDF

Original price was: $81.00.Current price is: $46.17.

Configuration Control for Maintaining Correlation of Gas Turbine Engine Test Cells

PDF Format Searchable Printable Bookmarks
Guaranteed Safe Checkout

Description

The configuration of a test facility that exists at the time when a correlation is being carried out should be “base lined” as a condition of correlation approval acceptance, and, be maintained during the time period that the respective correlation approval lasts. This defines test facility configuration control.
This is due to the fact that a change in configuration may have the potential to change the established correlation factors and measured engine performance. If such a change occurs then this should be judged by the respective OEM’s or designated correlation approval authorities Subject Matter Expert (SME). In some cases, this may involve consultation with the engine project customer or airworthiness authorities.
The purpose of this paper is to recommend a means of identifying, recording, documenting and maintaining the configuration status of all correlations, including those where re-approval is achieved by using statistical trending methods rather than physical back-to-back type testing.
This paper can be considered applicable to all types and standards of test facilies in the aero, marine and industrial gas turbine engine businesses.

History

ARP6028A 2020-10-21 Latest Reaffirmed
ARP6028 2009-03-13 Historical Issued
ISSUING COMMITTEE

EG-1E Gas Turbine Test Facilities and Equipment

DATE

2009-03-13

DOI

https://doi.org/10.4271/ARP6028

ISCURRENT
PAGE

7

PUBLISHER

SAE International

REVISED

ISSUED

Reviews

There are no reviews yet.

Be the first to review “SAE ARP6028 PDF”

Your email address will not be published. Required fields are marked *

Please select a variation to view its pdf.

SAE ARP6028 PDF
$81.00 Original price was: $81.00.$46.17Current price is: $46.17.