SAE AS683C PDF
Original price was: $99.00.$56.43Current price is: $56.43.
Installation Procedures and Torques for Fluid Connections
Description
These procedures cover the following:
Paragraph 3 – Cone end connections for flared tube and brazed ferrule, with and without gasket.
Paragraph 4 – Boss end connections, positioned type, with back-up ring.
Paragraph 5 – Boss end connections, positioned type, without back-up ring
Paragraph 6 – Boss end connections, non-positioned type.
Paragraph 7 – Bulkhead connections.
History
| AS683E | 2019-10-28 | Latest | Revised |
| AS683D | 2012-03-01 | Historical | Revised |
| AS683C | 2006-05-04 | Historical | Reaffirmed |
| AS683B | 1995-05-01 | Historical | Reaffirmed |
| AS683A | 1976-09-01 | Historical | Revised |
| ISSUING COMMITTEE | E-25 General Standards for Aerospace and Propulsion Systems |
|---|---|
| DATE | 2006-05-04 |
| DOI | |
| ISCURRENT | |
| PAGE | 11 |
| PUBLISHER | SAE International |
| REVISED | REAFFIRMED |
Please select a variation to view its pdf.






Reviews
There are no reviews yet.